-
Terms (Web Page)
Terms and Conditions
Changes and Improvements
All equipment described in GEOKON, INC catalogs is subject to modification and improvement as may be dictated by subsequent developments. Accordingly, w ...
-
Worldwide Partners (Web Page)
GEOKON Authorized Partners
About Our Partners
GEOKON Authorized Partners provide assistance with the selection, procurement, and support of GEOKON products (i.e., repair, main ...
-
Pipelines (Web Page)
Overview
Where pipelines pass over unstable slopes any movements may result in lateral forces to act on the pipe which may cause it to bend and possibly rupture. To monitor the strains in the pi ...
-
Recent Projects (Web Page)
Measuring Railroad Track Tie/Ballast Interfacial Pressures
Mascot, Tennessee, USA
Joint research conducted by Dr. Jerry Rose and Travis Watts (University of Kentucky), Dr. David Clarke (Uni ...
-
Instantel Returns (Web Page)
Instantel Return Material Authorization Procedure:
Please visit the Instantel Return Material Authorization (RMA) Service Portal to login, create an account, open a new calibration or repair service ...
-
Tech Tips (Web Page)
General Tech Tips
Technical Support Check List
Multi-Point Borehole Extensometer Design Considerations
Gauge Tech Tips
Initial Zero Readings
Troubleshooting with ...
-
Permissions, Terms, and Consent (Web Page)
Photo Use
Release, Permissions and Terms
If you have provided GEOKON, INC with a project summary to be featured on our Recent Projects page, added to our collection of various Projects, and/or p ...
-
Warranty (Web Page)
Product Warranty Statement
Warranty Coverage
GEOKON warrants its products to be free from defects in materials and workmanship for 24 months from the date of purchase, under normal use. If a produc ...
-
Service Providers (Web Page)
Ardaman & Associates, Inc. › Ardaman & Associates provides geotechnical engineering and full-service construction materials testing and inspection services throughout the Gulf Coast Region. Our geo ...
-
Embankments (Web Page)
Overview
The construction (staged or surcharged) of highway embankments and levees often require instrumentation to monitor the progress of consolidation and to determine whether the embankment ...