Please note: GEOKON will be closed Thursday, November 27 and Friday, November 28 in observance of Thanksgiving. Normal business hours resume Monday, December 1.
Loading... Please wait...New and recently updated (within the last 6 months) files are shown with shaded background, bold revision, date and size.
If you have any difficulties viewing the PDF files found below, please see this article: Acrobat Help. If this doesn’t resolve the issue, please contact GEOKON to request a copy via email.
| Description | Revision: | Date: |
|---|---|---|
| 8900 Series GeoNet Data Hosting System | — | 09.2020 |
| Geotechnical + Structural Monitoring Instrumentation | — | 09.2019 |
| Dam Monitoring Instrumentation | — | 09.2019 |
| Mine Monitoring Instrumentation | — | 09.2019 |
| Tunnel Monitoring Instrumentation | — | 09.2019 |
| Description | Revision: | Date: |
|---|---|---|
| MEMS Accuracy Paper | Rev. 5 | 01.2019 |
| 13-Step Procedure for Systematic Planning | — | 01.2017 |
| Description | Revision: | Date: |
|---|---|---|
| Geotechnical Instrumentation | Rev. Init | 11.2008 |
| Concrete Dam Instrumentation | Rev. Init | 11.2008 |
| Earth Dam Instrumentation | Rev. Init | 11.2008 |
| Tunnelling Instrumentation | Rev. Init | 11.2008 |
| Deep Excavation Monitoring Instrumentation | Rev. Init | 11.2008 |
| Pile Testing Instrumentation | Rev. Init | 11.2008 |
| Description | Revision: | Date: |
|---|---|---|
| Geotechnical Instrumentation | Rev. Init | 11.2008 |
| Concrete Dam Instrumentation | Rev. Init | 11.2008 |
| Earth Dam Instrumentation | Rev. Init | 11.2008 |
| Tunnelling Instrumentation | Rev. Init | 11.2008 |
| Deep Excavation Monitoring Instrumentation | Rev. Init | 11.2008 |
| Pile Testing Instrumentation | Rev. Init | 11.2008 |